Hi,
I configured the rate factor into the storage Tier profile at "infraestructure cost" option, and when I run a report at vDC level the rate factor is ignored and replaced with "1". but when I run the report at vapp level the rate factor that I did configured is used, and when I run the report at vapp FOLDER level, the rate factor that I configured is considered too,
What could be happening? Obviusly this behavior is not desired for my Allocation or Reservation customer vDCs. where the cost must be calculated for the total chunk of resorces at vDC level, not at vapp level.
Please anyone that have an Idea?
Tier 0 -> Factor 1,5
Tier 1 -> Factor 0,75
Tier 2 -> Factor 0,2
nomenclature: vapp[consecutive inside the tier level]-t[tier level used]
VCDCC0 -> Uses Tier 0 and 1
VCDCC2 -> Uses Tier 2